Still waiting on builder’s quotes…

March 25, 2007 at 8:31 pm (DIY, House renovation) (, , )

We’ve seen a few builders now and are waiting for their quotes; we haven’t done much work ourselves apart from a few small things; a coat rack (we’ve been bundling our coats on the banister), rehanging the bedroom doors (finally switching hinges from one side to the other), and I’ve started the process for the imminent wiring for ethernet 🙂

The plan is a have a central hub in the dining room and run ethernet and satellite cables to each room. I’ll probably run speaker cable in the sitting room too. All this will be under the floors (a few boards are already lifted from the electric rewire). It’s a bit tricky in places, especially going through doorways, as there’s already electricity cables (interference) and hot pipes to avoid!

I’ll post pictures when I have some – wish me luck!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: